Overview Personnel Projects References Awards
Civil Structural Mechanical Electrical Constr. Mgmt. Facilities Management and Documents ![]() ![]()
![]() ![]() ![]() ![]() October 2004 |
DOCUMENT MANAGEMENT FEES Fees will vary depending on the quantity and quality of the existing documents and the building conditions. Larger buildings will tend to have a lower fee; smaller buildings a higher fee, proportionately. An initial meeting with Endex would establish the scope of the Document program and the related fees. No services would be initiated without written Authorization. ![]() There is no charge for the initial meeting. If you have questions, please contact us by e-mail at: documents@endex.com or at the phone number listed below.
* VARIES WIDELY. Recent Buildings with complete documentation may not need any Infill work. Older Buildings with no documentation might require floor plans, and a building survey of utilities. Upper end costs might be $ 5000 for a service level of documentation. ** Quantity: 40 drawings and related equipment information in Adobe or other image files. Autocad drawings for all systems would be available at a fee to be detemined based on the existing documentation and the systems covered. *** No front end costs. Updates are generated as buildings are remodeled, equipment is serviced and replaced. Updates are implemented as needed. Fees noted above do not include file cabinet or flat file furniture. Return to Top of Page Return to Endex Facilities Management Return to Endex Homepage Endex Engineering 223 NW Second Street Corvallis, Oregon 97330 (541) 754-9517
|
![]()
|